CE6704 ESTIMATION AND QUANTITY SURVEYING Notes
CE6704 ESTIMATION AND QUANTITY SURVEYING Notes Regulation 2013 Anna University free download. CE6704 Notes free pdf download.
CE6704 ESTIMATION AND QUANTITY SURVEYING Notes OUTCOMES:
The student shall be able to estimate the material quantities, prepare a bill of quantities, make specifications and prepare tender documents. Student shall be able to prepare value estimates.
CE6704 ESTIMATION AND QUANTITY SURVEYING Notes TEXTBOOKS:
- Dutta, B.N., “Estimating and Costing in Civil Engineering”, UBS Publishers & Distributors Pvt. Ltd., 2003.
- Kohli, D.D and Kohli, R.C., “A Text Book of Estimating and Costing (Civil)”, S.Chand & Company Ltd., 2004.
CE6704 ESTIMATION AND QUANTITY SURVEYING Notes REFERENCES:
- PWD Data Book.
- Tamilnadu Transparencies in Tender Act, 1998
- Arbitration and Conciliation Act, 1996
- Standard Bid Evaluation Form, Procurement of Goods or Works, The World Bank, April 1996.
1. ESTIMATE (CE6704 ESTIMATION AND QUANTITY SURVEYING Notes)
An estimate is the anticipated or probable cost of work and is usually prepared before the construction is taken up. It is indeed calculations or computations of various items of an engineering work.
2. QUANTITY SURVEY (CE6704 ESTIMATION AND QUANTITY SURVEYING Notes)
It is the schedule of all items of work in a building. These quantities are calculated from the drawing of the building. Thus quantity survey gives quantities of work done in case of each items, when priced gives the total cost. In short, quantity survey means calculations of quantities of materials required to complete the work concerned
3. SPECIFICATIONS (CE6704 ESTIMATION AND QUANTITY SURVEYING Notes)
Detailed specifications gives the nature, quality and class of work, materials to be used in the various parts of work , quality of the material, their proportions, method of preparation, workmanship and description of execution of work are required.
4. RATES (CE6704 ESTIMATION AND QUANTITY SURVEYING Notes)
The rates of various items of works, materials to be used in the construction and the wages of different categories of labor (skilled and unskilled) should be available for preparing an estimate. The cost of transportation charges should also be known. As far as possible sanctioned “Schedule of Rates” shall be followed or the rates may be worked out by the “Analysis of Rates” method.