CE8401 Syllabus Construction Techniques and Practices CTP
CE8401 Syllabus Construction Techniques and Practices CTP Regulation 2017 Anna University free download. Construction Techniques and Practices CTP Syllabus CE8401 pdf free download.
UNIT I CONSTRUCTION TECHNIQUES 9 CE8401 Syllabus Construction Techniques and Practices CTP
Structural systems – Load Bearing Structure – Framed Structure – Load transfer mechanism – floor system – Development of construction techniques – High rise Building Technology – Seismic effect – Environmental impact of materials – responsible sourcing – Eco Building (Green Building) – Material used – Construction methods – Natural Buildings – Passive buildings – Intelligent(Smart) buildings – Meaning – Building automation – Energy efficient buildings for various zones-Case studies of residential, office buildings and other buildings in each zones.
UNIT II CONSTRUCTION PRACTICES 9 CE8401 Syllabus Construction Techniques and Practices CTP
Specifications, details and sequence of activities and construction co-ordination – Site Clearance – Marking – Earthwork – masonry – stone masonry – Bond in masonry – concrete hollow block masonry – flooring – damp proof courses – construction joints – movement and expansion joints – pre cast pavements – Building foundations – basements – temporary shed – centering and shuttering – slip forms – scaffoldings – de-shuttering forms – Fabrication and erection of steel trusses – frames – braced domes – laying brick –– weather and water proof – roof finishes – acoustic and fire protection.
UNIT III SUB STRUCTURE CONSTRUCTION 9 CE8401 Syllabus Construction Techniques and Practices CTP
Techniques of Box jacking – Pipe Jacking -under water construction of diaphragm walls and
basement-Tunneling techniques – Piling techniques – well and caisson – sinking cofferdam – cable
anchoring and grouting – driving diaphragm walls, sheet piles – shoring for deep cutting – well points -Dewatering and stand by Plant equipment for underground open excavation.
UNIT IV SUPER STRUCTURE CONSTRUCTION 9 CE8401 Syllabus Construction Techniques and Practices CTP
Launching girders, bridge decks, off shore platforms – special forms for shells – techniques for heavy decks – in-situ pre-stressing in high rise structures, Material handling – erecting light weight components on tall structures – Support structure for heavy Equipment and conveyors – Erection of articulated structures, braced domes and space decks.
UNIT V CONSTRUCTION EQUIPMENT 9 CE8401 Syllabus Construction Techniques and Practices CTP
Selection of equipment for earth work – earth moving operations – types of earthwork equipment – tractors, motor graders, scrapers, front end waders, earth movers – Equipment for foundation and pile driving. Equipment for compaction, batching, mixing and concreting – Equipment for material handling and erection of structures – types of cranes – Equipment for dredging, trenching, tunneling,
Subject name | Construction Techniques and Practices |
Short Name | CTP |
Semester | 4 |
Subject Code | CE8401 |
Regulation | 2017 regulation |
CE8401 Syllabus Construction Techniques and Practices CTP Click Here To Download
CE8401 Note Construction Techniques and Practices CTP
CE8401 Question Bank Construction Techniques and Practices CTP
CE8401 Question Paper Construction Techniques and Practices CTP
CE8401 Important Questions Construction Techniques and Practices CTP